The work's gotten
WAY bigger than we anticipated.
- The wall had heating ducts that needed to be re-routed.
- The new ducts will be in a different wall that had to be opened.
- The ducts had asbestos insulation that was removed by a HazMat team.
- The asbestos removal was invasive enough that it made sense to replace our (not so good) heater with a new one in an entirely different and better location.
- Oh, and apparently our electrical system was put in by chimpanzees in the 1920's. This has caused angst.